Skip to content
10 active vans · 24/7 · London & the M25
ResidentialCommon faults
Get in touch
Book an engineer

London-wide plumbing & heating

Bathroom fitting and plumbing in London

Bathroom installation and replacement work planned around the fittings, water supply and drainage, with the boundaries of the wider refurbishment agreed in advance.

  • Review the layout and plumbing routes
  • Install and connect the agreed fittings
  • Test before final handover
Chrome bath mixer tap and handheld shower above a bath
Illustrative photograph
10 active vans24/7 emergency responseAll London boroughs · Inside the M25

£5 million public liability insurance Gas work carried out by Gas Safe registered engineers. About our company →

Let’s get your job moving.

Tell us where you are and whether you need urgent help or a planned visit.

The work we handle

We fit bathrooms and alter bathroom plumbing across London and inside the M25: baths, showers, basins, toilets, water supplies and waste connections. Whether you are replacing a suite or changing the entire room, we plan the first-fix pipework and second-fix connections around your layout, hot water system and use of the property.

Review the layout and plumbing routes

Check where the bath, shower, basin and toilet will sit and whether existing supply and waste routes suit the proposed arrangement.

Install and connect the agreed fittings

Fit the selected sanitaryware and associated plumbing with compatibility and maintenance access considered.

Test before final handover

Check outlets, waste connections and normal use, coordinating the plumbing sequence with any separately agreed finishing work.

A clear route for your property.

Different faults and projects need different work. These are the main options for this service.

Plan the plumbing for your bathroom
Replace fittings in their current positions
Keeping a workable layout can reduce pipework changes while updating worn or unsuitable sanitaryware.
Change the bathroom layout
Moving a toilet or shower needs early checks on waste routes, falls, floor space and access before the final design is fixed.

From first enquiry to the next step

  1. Share the layout and fitting choices

    Tell us whether this is a replacement or a full layout change and which products have been selected.

  2. Agree plumbing and finishing boundaries

    We establish the installation scope and the order of work with tiling, waterproofing and other trades.

  3. Install and test the bathroom plumbing

    We check the connected fittings and explain any outstanding items before the room is handed over.

Agree the rates and scope before work starts. £60 call-out. Hourly rate agreed before we attend. For installations and larger work, the proposal sets out the agreed scope and price.

How our pricing works

Service details & practical advice

The work explained, answers to common questions and related services.

Bathroom fitting and complete plumbing alterations

Our bathroom plumbing work includes replacing fixtures in their existing positions, relocating supplies and wastes, connecting new showers and baths, and preparing the plumbing for a larger refurbishment. We survey proposed fixture positions before pipe routes or finished surfaces are committed, particularly where a toilet or shower is moving.

The proposal identifies the plumbing work, fittings being supplied and interfaces with waterproofing, tiling, ventilation and electrical work. For an occupied home, we plan the sequence around the facilities you need to retain. For a builder-led refurbishment, first fix, pressure testing and final connections are coordinated with the wider programme.

Check the water supply and hot water arrangement

Shower and tap performance depends on the system supplying them. The survey considers the existing hot water arrangement, usable flow and pressure and the outlets likely to operate together. A mixer chosen for its appearance may need conditions the property cannot provide without other work.

Describe any current weak flow, slow bath filling or changes when another tap runs. These are useful survey clues, not a diagnosis. Adding another shower may require a broader assessment than replacing a shower head. We will explain where a proposed fixture change depends on the supply, hot water equipment or distribution beyond the bathroom itself.

Toilets, waste routes and room layout

Moving the toilet can be the most consequential part of a layout change because the waste route and connection need to work. A floor plan should show the existing soil connection as well as the desired fixture position. Concealed obstructions and access restrictions may need checking before a preferred arrangement can be confirmed.

Shower trays, baths and basins also need suitable waste routes and access to serviceable fittings. The available floor depth and the position of the connection can affect a low-profile shower design. Decide how traps and concealed valves will be reached after completion, rather than planning a permanently sealed surface over every connection. If you are replacing a cracked shower tray, the support beneath it should be checked before the new tray goes in.

Choose fittings with installation details in mind

Before ordering, confirm product dimensions, connection positions, operating requirements and the space needed to maintain them. Wall-hung toilets, concealed cisterns and recessed shower controls can work well, but they need a supporting layout and a clear access plan. Keep the full model information rather than only a retailer photograph.

Water Regs UK explains the need for suitable backflow protection for bathroom fittings. Handheld showers and other outlets need an installation appropriate to their contamination risk. The correct arrangement is a design matter; a visually convenient hose position is not enough to establish suitability. Any electrical bathroom equipment needs separate competent assessment and installation.

Agree first fix, finishing and completion

The plumbing routes and connections are usually established before final surfaces and fittings are completed. Coordinate the sequence with waterproofing, wall finishes, floor finishes and fitted furniture. Tell us about materials that are already ordered and dates that depend on another contractor finishing first.

Agree the checks before concealed pipework is covered and the responsibilities for making good. At completion, the relevant outlets and controls need to be checked and explained, with any remaining work recorded. Keep accessible isolation points identifiable. A working tap does not by itself establish that every item in a bathroom refurbishment has been completed.

A clear proposal for your room

We set out the fixtures, pipework alterations, access and connections included, separating supplied products from customer-supplied fittings. Cost depends on changes to the layout, soil and waste routes, concealed access, supply requirements and the first-fix and finishing sequence. Work that depends on opening a floor or wall is identified provisionally, with changes agreed before proceeding. For a combined refurbishment, our kitchen plumbing and pipework services can be planned alongside the bathroom.

Mention any existing plans or photographs in your enquiry; the team can arrange how to share them. Include the postcode, property type and whether building-management consent is needed. Our 10 active vans support a 24/7 service across London and inside the M25, while planned bathroom work is scheduled around the agreed scope, access and materials.

Common questions

Can you replace the bathroom without moving the pipes?

A similar layout can reduce alterations, but the existing connections and condition still need checking. Product dimensions or concealed damage may require changes even where the fixtures appear to stay in the same place.

Does bathroom fitting include tiling and decoration?

Confirm this in the proposal. The plumbing scope and responsibility for waterproofing, finishes, electrics and decoration should be stated separately so you know which trade completes each stage.

Can I keep using the bathroom during the work?

Sometimes work can be phased, but it depends on the fixtures being changed and the available isolation. Explain your minimum facilities at the survey so the programme can address them.

Should I buy the shower first?

Choose the design you prefer, but confirm compatibility, dimensions and supply requirements before committing to the order. A survey can identify restrictions that affect the choice.

Sources and further reading

Choose the work you need

Where we work

Useful guides for this service

Explore all bathrooms, kitchens and pipework guides →

Need help with this in London?

Emergency repairs, investigations and planned installations across London and inside the M25. Tell us what you need so we can agree the next step.

Discuss your job